• Thank you for visiting the Cafe Rad Lab Forum
  • We present & discuss radiation health, science & news
  • To keep you informed about vital nuke information.
Hello There, Guest! Login Register


WEBCAM August 2019
#1
Post webcam observations for August here.  Observations should start with a date and ‘jst’ time (Japan Standard Time) and camera(s).  Describe as best as possible what you see.  Contribute data such as weather conditions, work activities, TEPCO or local news reports, radiation readings, earthquake activity, or any information that documents events occurring at Daiichi.  Comments and analysis welcome.  Help keep an eye on TEPCO's disaster site.  

TEPCO Cameras
Cam1
Cam4

Time Lapse Archives
Fukushima Daiichi
sengoku1904
Fuku1long

Environmental Archives
Archive of ENENews
"The map is not the territory that it is a map of ... the word is not the thing being referred to."
 
Reply
#2
08-04  @TEPCO_English  
At this stage, no abnormalities has been found at #TEPCO’s #Fukushima Daiichi and Daini NPS, as well as main power facilities after Magnitude 6.2 #earthquake off the coast of Fukushima at about 7:23PM JST Aug 4.

Video of Cam 4 - shakin’ in the quakin’
https://vimeo.com/352215506




\\\

Recent photo of Unit 2
Fukushima Daiichi Nuclear Power Plant “From Nuclear Fuel Removal Unit 2” Proposal Final Adjustment
August 5, 2019 23:35
https://www3.nhk.or.jp/news/html/2019080...41000.html
   
Google Translate
Quote:In the schedule, we are making final adjustments in a direction that incorporates the contents that melted nuclear fuel should be taken out from Unit 2 little by little.

In addition, it is expected that the extracted nuclear fuel will be temporarily stored in the premises in a metal container.


\\\

2019.7.24 Fuel removal work from the Unit 3 spent fuel pool at Fukushima Daiichi NPS  
4:46
https://www.youtube.com/watch?v=iTDuc4Gq...e=youtu.be


"The map is not the territory that it is a map of ... the word is not the thing being referred to."
 
Reply
#3
08-06, I'd seen a new crane load on Cam 1.  Microcarpa had a good explanation for the sight in her twitter feed.  See the link for a diagram and pics she included.  https://twitter.com/microcarpa1/status/1...4354276352
Quote:Around 1800(JST),#Tepco halts cutting work of vent stack due to malfunction of the rotating saw. The cutter equip has been removed back to on the ground to repair the saw. If Tepco could get back to the 1st removal attempt tomorrow is not sure. Rocky start  #脱原発 #Fukushima
microcarpa added,
microcarpa @microcarpa1
Aug7,1525(JST) #Tepco apparently resumes cutting off the #Fukushima Dai-ichi vent stack with new rotating saws. To remove the first part w/the cutter equip later.…
3:25 AM - 7 Aug 2019
1.
1. microcarpa‏ @microcarpa1 Aug 7
More
Halt of dismantling of #Fukushima No1 vent stack to be prolonged at least until Aug19. Rotating saw worn out&replaced breaks down to leave vent pipe<1/2 cut,Aug7.1st attempt to cut a 2~4m part Specialist warns of insufficient expertise of #Tepco's local subcontractor in charge.

Snips from the recordings.

   
   
"The map is not the territory that it is a map of ... the word is not the thing being referred to."
 
Reply
  


Possibly Related Threads...
Thread Author Replies Views Last Post
  WEBCAM August 2018 Horse 13 11,219 09-02-2018, 05:33 AM
Last Post: Horse
  WEBCAM August 2017 Horse 27 37,809 08-30-2017, 11:06 AM
Last Post: Horse
  WEBCAM August 2016 Horse 31 63,606 09-01-2016, 06:05 AM
Last Post: Horse

Forum Jump:


Browsing: 1 Guest(s)