The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are/is 1 EN(s) today, 3 associated with power stations.

[ The one EN is an NRC repost ]

NRC Event Notices for June 14, 2019 |
https://www.nrc.gov/reading-rm/doc-colle...614en.html

[ ]

--------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
--------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for NC_Brunswick_1 ]

20190612 | NC_Brunswick_1 | HIGH PRESSURE COOLANT INJECTION (HPCI) INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54116

"At 2127 EDT on June 12, 2019,
during routine testing, the HPCI turbine experienced an overspeed trip
and then subsequently restarted and ramped to the required speed.

 As a result, the response time of the system exceeded the 60-second acceptance criteria,
thereby rendering the system inoperable.

This condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(D).

The Reactor Core Isolation Cooling (RCIC) System and Automatic Depressurization System (ADS) are operable.

"The safety significance of this event is minimal.

Troubleshooting activities are in progress.

"There was no impact on the health and safety of the public or plant personnel.
The NRC Resident Inspector has been notified."


----------- [ 2019 event history for NC_Brunswick ]

20190506 | NC_Brunswick_2 | NOUE DUE TO FIRE LASTING LONGER THAN 15 MINUTES IN TURBINE BUILDING |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54052


20190421 | NC_Brunswick_1 | AUTOMATIC REACTOR TRIP AND SPECIFIED SYSTEM ACTUATION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54016


20190420 | NC_Brunswick_2 | Completed RFO ( 28 / 28 )

20190330 | NC_Brunswick_2 | MANUAL REACTOR SCRAM AND SPECIFIED SYSTEM ACTUATION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53966


20190330 | NC_Brunswick_2 | Exit  RFO ( 28 / 28 )

20190328_1654 EDT | NC_Brunswick_1 | AUTOMATIC ACTUATION OF THE PRIMARY CONTAINMENT ISOLATION SYSTEM AND THE REACTOR PROTECTON SYSTEM |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53962

20190328_1450 EDT | NC_Brunswick_1 | UNUSUAL EVENT DECLARED DUE TO RCS UNIDENTIFIED LEAKAGE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53961

20190325 | NC_Brunswick_1;2 | AUTOMATIC START OF FOUR EMERGENCY DIESEL GENERATORS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53955
RFOD_024; RX Mode: Cold Shutdown; Cold Shutdown

20190305 | NC_Brunswick_2 | AUTOMATIC ACTUATION OF THE PRIMARY CONTAINMENT ISOLATION SYSTEM |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53911
RFOD_004; RX Mode: Refueling; Refueling

20190302 | NC_Brunswick_2 | Begin RFO ( 01 / 28 )


20190131 | NC_Brunswick_1;2 | Update PART 21 - COMPONENTS PROVIDED AS SAFETY-RELATED SPARE PARTS WITHOUT BEING DEDICATED |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53816

20190107 | NC_Brunswick_1;2 | PART 21 - COMPONENTS PROVIDED AS SAFETY-RELATED SPARE PARTS WITHOUT BEING DEDICATED |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53816


----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for


----------- [ 2019 event history for


----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for


----------- [ 2019 event history for

[ no previous ENs for this site in 2019 ]
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2019 event history for
[ no previous ENs for this site in 2019 ]
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
------------[ PART 21 ] - These ENs are for issues that involve multiple site/reactor units
----------------------------------------------------------------------------------------------------------------------------------------------------


-----------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------------------------------------------
------------Other reactor info from daily power tracking https://www.nrc.gov/reading-rm/doc-colle...atus/2019/
-----------------------------------------------------------------------------------------------------------------

[  ]

Region 1

NY_Ginna_1 @ 99 % down from 100 % 20190614
[ no EN, unk reasn for power drop ]

NJ_Hope_Creek_1 @ 99 % unch from down from 100 % 20190612
[ no EN, unk reasn for power drop ]

MA_Pilgrim_1 @ 0 % - PERMANENT SHUTDOWN

NJ_Salem_1 @ 0 % [ RPV OPEN ( 63 / 28 ) ] RFO started early


Region 2

AL_Browns_Ferry_2 @ 96 % unch from 96 % up from 95 % unch from 95 % Sunday; 95 % Saturday
[ Completed RFO ( 39 / 25 ) ] power uprate testing, missed planned restart date

FL_Saint_Lucie_1 @ 0 % since 20190425
 AUTOMATIC REACTOR TRIP DUE TO TURBINE GENERATOR TRIP |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54027


Region 3  

IL_Clinton_1 @ 98 % unch from 98 % since 20190527
[ 98-99 % are this units normal thermal power range. ]


Region 4

AR_Arkansas_2 @ 0 % unch from 0 % since 20190527
 AUTOMATIC REACTOR TRIP DUE TO A REACTOR COOLANT PUMP TRIP ON GROUND FAULT |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54091

WA_Columbia_2 @ 0 % [ RPV OPEN ( 32 / 31 ) ] plnd start 20190515 ] started early  

LA_RiverBend_1 @ 69 % down from 97 % up from 78 % up from 39 % up from 38 % unch from 38 % Sunday; 32 % Saturday
 MANUAL REACTOR SCRAM DUE TO LOW REACTOR WATER LEVEL |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54096
[ Exit RFO ( 42 / 34 ] 2nd restart failed; 1st restart failed; missed planned restart date

----------------------------------------------------------------------------------------------------------------------------------------------------

[ There is/are currently 02 unit(s) with the RPV OPEN - ref the 2019 Spring Refueling Outage Schedule and Status ]