• Thank you for visiting the Cafe Rad Lab Forum
  • We present & discuss radiation health, science & news
  • To keep you informed about vital nuke information.
Hello There, Guest! Login Register


NPS_Watch Jun 05, 2019
#1
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There is 3 EN(s) today, 2 associated with power stations.

[ ]

NRC Event Notices for June 05, 2019 |
https://www.nrc.gov/reading-rm/doc-colle...605en.html

[  ]

--------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
--------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for NE_Cooper_1 ]

20190604 | NE_Cooper_1 | ISSUANCE OF PRESS RELEASE DUE TO SPURIOUS ACTUATION OF EMERGENCY SIRENS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54099


"On 06/04/2019, Nebraska Public Power District will issue a press release concerning the spurious actuation
of emergency sirens near Cooper Nuclear Station and Indian Cave State Park.

"This is a four hour report per 10 CFR 50.72(b)(2)(xi) for any event or situation for which a news release
is planned or notification to other government agencies has been or will be made which is related to
heightened public or government concern."

The cause of the siren actuation is still under investigation.

The licensee notified the NRC Resident Inspector.


* * * UPDATE FROM TERRELL HIGGINS TO HOWIE CROUCH AT 1301 EDT ON 6/4/19 * * *

"During this event, State & local government agencies (Nemaha County, Atchison County, Richardson County,
and Indian Cave State Park) were contacted regarding the spurious actuation of emergency sirens.

This is an update to the original Event Notification # 54099."

Notified R4DO (Kellar).


----------- [ 2019 event history for NE_Cooper ]

20190530 | NE_Cooper_1 | Retract SECONDARY CONTAINMENT DECLARED INOPERABLE DUE TO POTENTIAL EQUIPMENT FAILURE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54049

20190505 | NE_Cooper_1 | SECONDARY CONTAINMENT DECLARED INOPERABLE DUE TO POTENTIAL EQUIPMENT FAILURE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54049

20190324 | NE_Cooper_1 | Update UNUSUAL EVENT DECLARED DUE TO HIGH RIVER LEVEL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53934

20190316 | NE_Cooper_1 | LOSS OF TONE ALERT RADIO TRANSMISSION TOWER |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53941

20190315 | NE_Cooper_1 | UNUSUAL EVENT DECLARED DUE TO HIGH RIVER LEVEL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53934

[ no previous ENs for this site in 2019 ]

----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for PA_Limerick_2 ]

20190604 | PA_Limerick_2 | MANUAL SCRAM DURING RAPID PLANT SHUTDOWN |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54098

"At 0145 EDT, on 6/4/19, Unit 2 was manually scrammed during a Rapid Plant Shutdown.

At 64 percent reactor power, a Rapid Plant Shutdown was initiated due to lowering Main Condenser vacuum
as a result of the loss of a plant electrical panel that powers Offgas System controls.

"The shutdown was normal and the plant is stable in Hot Shutdown with normal pressure control via the Main Turbine Bypass Valves
to the Main Condenser and normal level control using Feedwater and Condensate.

Main Condenser Vacuum has been restored."

The licensee notified the NRC Resident Inspector.
Additionally, state and local government agencies were notified.

Prior to restarting Unit 2, an evaluation needs to be done due to the Unit 1 Diesel currently out of service for maintenance.
The Unit 1 Diesel is a power supply for some of the common systems under the Unit 2 Technical Specifications and therefore required.


----------- [ 2019 event history for PA_Limerick ]

20190524 | PA_Limerick_2 | INVALID ACTUATION OF A UNIT 2 CONTAINMENT ISOLATION LOGIC DUE TO A BLOWN FUSE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54083
RFOD_004; RX Mode: Refueling; Refueling  [ 60 day late report for 20190418 ]

20190509 | PA_Limerick_2 | @ 100 %


20190503 | PA_Limerick_2 | Exit RFO ( 18 / 20 )

20190421 | PA_Limerick_1 | INVALID ACTUATION OF A UNIT 1 CONTAINMENT ISOLATION LOGIC DUE TO A BLOWN FUSE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54014
[ 60 day late report for 20190222 ]

20190421 | PA_Limerick_2 | LIMERICK ONSITE NON-WORK RELATED FATALITY |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54015
RFOD_007; RX_Mode: Refueling; Refueling

20190418 | PA_Limerick_2 | INVALID ACTUATION OF A UNIT 2 CONTAINMENT ISOLATION LOGIC DUE TO A BLOWN FUSE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54083
RFOD_004; RX Mode: Refueling; Refueling  [ 60 day late report ]

20190415 | PA_Limerick_2 | Begin RFO ( 01 / 20 )


20190222 | PA_Limerick_1 | INVALID ACTUATION OF A UNIT 1 CONTAINMENT ISOLATION LOGIC DUE TO A BLOWN FUSE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en54014
[ 60 day late report ]

20190201 | PART21 | PART 21 - NOTIFICATION OF DEVIATION OF SWITCHES WITH TERMINAL BLOCKS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53856

----------------------------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for


----------- [ 2019 event history for

[ no previous ENs for this site in 2019 ]

----------------------------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2019 event history for
[ no previous ENs for this site in 2019 ]
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
------------[ PART 21 ] - These ENs are for issues that involve multiple site/reactor units
----------------------------------------------------------------------------------------------------------------------------------------------------


-----------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------------------------------------------
------------Other reactor info from daily power tracking https://www.nrc.gov/reading-rm/doc-colle...atus/2019/
-----------------------------------------------------------------------------------------------------------------

[  ]

Region 1

NJ_Hope_Creek_1 @ 99 % down from 100 % Teusday
[ no EN, unk reason for power drop. ]

PA_Limerick_2 @ 0 % down from 100 % Monday
 MANUAL SCRAM DURING RAPID PLANT SHUTDOWN |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54098

MA_Pilgrim_1 @ 0 % - PERMANENT SHUTDOWN

NJ_Salem_1 @ 0 % [ RPV OPEN ( 54 / 28 ) ] RFO started early


Region 2

AL_Browns_Ferry_2 @ 50 % down from 94 % unch from 94 % Sunday; 94 % Saturday
[ Completed RFO ( 39 / 25 ) ] power uprate testing, missed planned restart date

FL_Saint_Lucie_1 @ 0 % since 20190425
 AUTOMATIC REACTOR TRIP DUE TO TURBINE GENERATOR TRIP |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54027


Region 3  

IL_Clinton_1 @ 98 % unch from 98 % Sunday; 98 % Saturday
[ 98-99 % are this units normal thermal power range. ]

OH_Perry_1 @ 97 % down from 100 % up from 70 % up from 22 % Sunday; 25 % Saturday
[ no EN, unk reason for power drop. ]


Region 4

AR_Arkansas_2 @ 0 % unch from 0 % since 20190527; 100 % Sunday; 100 % Saturday
 AUTOMATIC REACTOR TRIP DUE TO A REACTOR COOLANT PUMP TRIP ON GROUND FAULT |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54091

WA_Columbia_2 @ 0 % [ RPV OPEN ( 23 / 31 ) ] plnd start 20190515 ] started early  

LA_RiverBend_1 @ 0 % since 20190601
 MANUAL REACTOR SCRAM DUE TO LOW REACTOR WATER LEVEL |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en54096
[ Exit RFO ( 42 / 34 ] 2nd restart failed; 1st restart failed; missed planned restart date


----------------------------------------------------------------------------------------------------------------------------------------------------

[ There is/are currently 02 unit(s) with the RPV OPEN - ref the 2019 Spring Refueling Outage Schedule and Status ]