NPS_Watch Apr_12, 2019
#1
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 8 EN(s) today, 1 associated with power stations.

[  ]

NRC Event Notices for April 12, 2019 |
https://www.nrc.gov/reading-rm/doc-colle...412en.html


oops mis-dated yesterdays post, went too far ahead adjusting clock to daylight savings time.
 ]

--------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
--------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for LA_Waterford_3 ]

20190411 | LA_Waterford_3 | CONTROL ROOM ENVELOPE INOPERABLE DUE TO DOOR HANDLE DETACHING |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53991

"On April 11, 2019, at 0200 CDT the shift operating crew declared the control room envelope inoperable
in accordance with Technical Specification (TS) 3.7.6.1 due to the door handle for Door 86 (H&V Airlock Access Door) being detached.
{ H&V - heating and ventilation ? maybe the handle got broke off during equipment moving. ]


Operations entered TS 3.7.6.1 action b,

which requires that with one or more control room emergency air filtration trains inoperable
due to inoperable control room envelope boundary in MODES 1, 2, 3, or 4,

then:
1. Immediately initiate action to implement mitigating actions;
2. Within 24 hours, verify mitigating actions ensure control room envelope occupant exposures
    to radiological, chemical, and smoke hazards will not exceed limits; and
3. Within 90 days, restore the control room envelope boundary to OPERABLE status.

Action b.1 was completed by sealing the hole in Door 86 at 0232 CDT.
[ It's unclear if they used the sillyputty or duct tape from the emergency repair kit. ]

This event is reportable pursuant to 10 CFR 50.72(b)(3)(v)(D),
'event or condition that could have prevented fulfilment of a safety function of structures or systems
that are needed to (D) mitigate the consequences of an accident,
' due to the control room envelope being inoperable.

"The licensee notified the NRC Resident."




----------- [ 2019 event history for LA_Waterford ]

20190323 | LA_Waterford_3 | 100 % power Completed RFO

20190317 | LA_Waterford_3 | Exit RFO ( 70 / 39 )

20190118 | LA_Waterford_3 | REACTOR COOLANT SYSTEM WELD DOES NOT MEET ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53837
[ RFOD_014; RX Mode: Refueling; Refueling ]

20190117 | LA_Waterford_3 | RELEVANT INDICATION OF DEGRADED CONDITION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53834
[ RFOD_013; RX Mode: Refueling; Refueling ]

20190105 | LA_Waterford_3 | Begin RFO ( 01 / 39 )


----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2019 event history for

----------------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2019 event history for
[ no previous ENs for this unit in 2019 ]

----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
------------[ PART 21 ] - These ENs are for issues that involve multiple site/reactor units
----------------------------------------------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------


Region 1
 
NY_Indian_Point_3 @ 92 % up from 75 % up from 40 % up from 2 % up from 0 %
[ Exit RFO ( 29 / 30 ) 20190312 ]

PA_Limerick_2 @ 85 % [ coastdown to RFO 20190415 ]

CT_Millstone_3 @ 0 % down from 88 % Thursday [ coastdown to RFO 20190418 ]
[ no EN, unk reason for power drop, unit may have entered RFO early ]

NY_Nine_Mile_Point_1 @ 0 % [ RPV OPEN ( 26 / 21 ) ] missed planned restart

NJ_Salem_1 @ 67 % [ coastdown to RFO 20190426 ]

PA_Susquehanna_2 @ 0 % [ RPV OPEN ( 21 / 35 ) 20190323 ]


Region 2

AL_Browns_Ferry_2 @ 50 % up from 38 % up from 0 %
[ Exit RFO ( 39 / 25 ) ] missed planned restart date ]

NC_Brunswick_1 @ 84 % up from 23 % up from 0 % unch from 0 % 20190329
 AUTOMATIC ACTUATION OF THE PRIMARY CONTAINMENT ISOLATION SYSTEM AND THE REACTOR PROTECTON SYSTEM |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53962

 UNUSUAL EVENT DECLARED DUE TO RCS UNIDENTIFIED LEAKAGE |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53961

NC_Brunswick_2 @ 2 % up from 0 % unch from 0 % 20190331 [ exit RFO ( 28 / 28 ) ]
 [ recovering from ]
 MANUAL REACTOR SCRAM AND SPECIFIED SYSTEM ACTUATION |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53966

AL_Farley_1 @ 99 % down from 100 % Thursday
[ no EN, unk reason for power drop. ]

AL_Farley_2 @ 0 % [ RPV OPEN ( 05 / 28 ) 20190405 ]

NC_McGuire_1 @ 0 % [ RPV OPEN ( 21 / 31 ) 20190323 ]

VA_NorthAnna_2 @ 73 % up from 48 % up from 8 % up from 0 %
[ Exit RFO ( 37 / 36 ) ] missed planned restart date

FL_Turkey_Point_4 @ 48 % up from 12 % up from 2 % up from 0 %
[ Exit RFO ( 30 / 28 ) 20190311, missed planned restart date ]

TN_Watts_Bar_2 @ 95 % down from 100 % Thursday [ coastdown to RFO 20190413 ]


Region 3

IL_Byron_2 @ 0 % [ RPV OPEN ( 05 / 18 ) 20190408 ]

IL_Clinton_1 @ 98 %
[ 98-99 % are this units normal thermal power range. ]

MI_DC_Cook_1 @ 0 % [ RPV OPEN ( 38 / 30 ) 20190306  ]
[ missed planned restart date ]

MN_Monticello_1 @ 73 %  [ coastdown to RFO 20190413 ]

OH_Perry_1 @ 100 % up from 80 % down from 94 % up from 75 % up from 37 % up from 19 % Sunday; 5 % Saturday [ Completed RFO ( 27 / 34 ) 20190309 ]

WI_Point_Beach_1 @ 0 % [ RPV OPEN ( 21 / 26 ) 20190322 ]



Region 4

MO_Callaway_1 @ 0 % [ RPV OPEN ( 11 / 42 ) 20190401; no coastdown 24hr SD

TX_ComanchePeak_1 @ 81 % [ coastdown to RFO 20190407 ] missed planned start date ]

MS_GrandGulf_1 @ 93 % up from 81 % up from 68 % down from 100 % up from 91 % up from 83 % Sunday; 58 % Saturday
[ no EN, unk reason for power drop. ]

AZ_PaloVerde_1 @ 0 % [ RPV OPEN ( 07 / 30 ), no coastdown, slamdown Friday

LA_RiverBend_1 @ 0 % [ RPV OPEN ( 14 / 34 ]


----------------------------------------------------------------------------------------------------------------------------------------------------

[ There is/are currently 10 unit(s) with the RPV OPEN - ref the 2019 Spring Refueling Outage Schedule and Status ]