The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 5 EN(s) today, 2 associated with power stations.

This delayed report for Friday is provided to maintain date continuity. Major gas leak and power outage in my area prevented me from collecting data and posting this on Friday. ]

NRC Event Notices for September 14, 2018 |
https://www.nrc.gov/reading-rm/doc-colle...914en.html

[ event times not entered ]

----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for NY_IndianPoint_2;3 ]

20180914 | NY_IndianPoint_2;3 | HURRICANE NOTIFICATION PER TECHNICAL REQUIREMENT FOR HURRICANE FLORENCE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53601

"A hurricane is within 500 nautical miles from Indian Point Energy Center with wind speed in excess of 87 knots.

The National Weather Service has issued a hurricane warning for a hurricane with wind in excess of 87 knots (approximately 100 mph)within 500 nautical miles of the facility.

Per the Technical Requirement Manual a prompt report shall be made to the NRC Incident Response Center within 1 hour of receipt of that hurricane warning.

"The licensee has notified the NRC Resident Inspector."



----------- [ 2018 event history for NY_IndianPoint ]

20180907 | NY_IndianPoint_3 | TECHNICAL SPECIFICATION REQUIRED SHUTDOWN |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53589

20180901 | NY_IndianPoint_3 | FITNESS-FOR-DUTY - CONTRABAND DISCOVERED IN PROTECTED AREA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53578

20180523 | NY_IndianPoint_2;3 | PART 21 - WEAR OF THERMAL SLEEVE IN WESTINGHOUSE CONTROL ROD DRIVE MECHANISMS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53422


20180419_2107 | NY_IndianPoint_2 | MANUAL REACTOR TRIP DUE TO TURBINE ISSUE
https://www.nrc.gov/reading-rm/doc-colle...ml#en53348


20180419 | NY_IndianPoint_2 | exit RFO

20180331 | NY_IndianPoint_2 | ONE HEAD PENETRATION NOT ACCEPTABLE DURING PENETRATION EXAMINATIONS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53305

20180319 | NY_IndianPoint_2 | Begin RFO


20180216 | NY_IndianPoint_3 | AUTOMATIC TRIP DUE TO LOSS OF EXCITATION ON MAIN GENERATOR     
https://www.nrc.gov/reading-rm/doc-colle...ml#en53216


----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for MI_Fermi_2 ]

20180824 | MI_Fermi_2 | INOPERABLE SEISMIC MONITORING SYSTEM |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53562

"At 0745 EDT on August 24, 2018, the Active Seismic Monitoring System failed a planned surveillance test and was declared inoperable.
Compensatory measures to provide alternative methods for event classification of a seismic event have been implemented in accordance
with the Fermi 2 Emergency Plan procedures. The compensatory measures include the use of information provided by the United States
Geological Survey (USGS) to confirm if an earthquake has occurred within a 100 mile radius.

"The loss of the Active Seismic Monitoring System is reportable to the NRC within 8 hours of discovery in accordance with 10CFR50.72(b)(3)(xiii).

"No seismic activity has been felt onsite and the USGS recorded no seismic activity in the area.

"The NRC Resident Inspector bas been notified."

* * * RETRACTION FROM JEFF GROFF TO VINCE KLCO ON SEPTEMBER 13, 2018 AT 1524 EDT * * *

"After further review the Active Seismic Monitoring system was removed from service for planned maintenance
for a duration less than 72 hours with appropriate compensatory measures established.

Therefore, no major loss of emergency assessment capability occurred. In addition,
the surveillance tests were re-performed and the Active Seismic Monitoring System was declared Operable.

Therefore, no reportable condition existed and EN 53562 reported on August 24, 20I8 is being retracted.

"The NRC Resident Inspector has been notified."

Notified the R3DO (Hanna).

----------- [ 2018 event history for MI_Fermi ]

20180820 | MI_Fermi_2 | FAILED FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53554

20180803 | MI_Fermi_2 | HIGH PRESSURE COOLANT INJECTION DECLARED INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53537

20180531 | MI_Fermi_2 | REACTOR WATER CLEANUP SYSTEM DECLARED INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53435

20180530 | MI_Fermi_2 | Open house Q&A Monroe, MI

20180527 | MI_Fermi_2 | REACTOR WATER CLEANUP SYSTEM DECLARED INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53429

20180526 | MI_Fermi_2 | at 100 % thermal power

20180524 | MI_Fermi_2 | NRC to Hold Open House to Discuss 2017 Performance |
https://www.nrc.gov/reading-rm/doc-colle...19.iii.pdf


20180507 | MI_Fermi_2 | restarted

20180504 | MI_Fermi_2 | OFFSITE NOTIFICATION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53385

20180414 | MI_Fermi_2 | AUTOMATIC REACTOR SCRAM AND EMERGENCY CORE COOLING SYSTEM INJECTION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53336


20180301 | MI_Fermi_2 | FITNESS FOR DUTY - POSITIVE RESULT FOR ALCOHOL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53236

20180215 | MI_Fermi_2 | FITNESS FOR DUTY - CONTRABAND DISCOVERED IN THE PROTECTED AREA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53214

20180122 | MI_Fermi_2 | OFFSITE NOTIFICATION DUE TO OIL SPILL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53178

20180111 | MI_Fermi_2 | SECONDARY CONTAINMENT MOMENTARY LOW PRESSURE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53165


----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2018 event history for

--------------------------------------------------------------------------------------------------
----------- [ Part 21 Notice ]


----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------

[ the asterisk signifies that an uptick in rad detection at nearby EPA radmon stations was observed on NETC. ]
[ NETC reflecting EPA stn data ]


Region 1

PA_BeaverValley_2 @ 99 % [ coastdown to RFO 20181021 ]

MD_Calvert_Cliffs_2 @ 100 % up from 83 % ; 100 % , no EN, reason for power drop unk.

NY_Fitzpatrick_1 @ 0 % [ begin RFO 20180910 ]

NY_Indian_Point_2 @ 0 % TECHNICAL SPECIFICATION REQUIRED SHUTDOWN |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53589

NJ_Oyster_Creek_1 @ 70 % unch from 70 % Jul 29 [ coastdown to permanent shutdown 20180917 ]

PA_Peach_Bottom_2 @ 95 % [ coastdown to RFO 20181015 ]  

MA_Pilgrim_1 @ 45 % down from 48 % ; 90 % ; 85 % ; 72 % unch from 72 % Saturday , no EN, cooling water too warm.

NJ_Salem_2 @ 92 %  [ coastdown to RFO 20181011 ]


Region 2


AL_BrownsFerry_1 @ 79 % unch from 79 % since Friday 20180810 , no EN, reason for power drop unk.
[ RFO 20181011 ]

NC_Brunswick_1 @ 0 % down from 88 % ; 100 % , no EN, hurricane Florence shutdown.

NC_Brunswick_2 @ 0 % down from 100 % , no EN, hurricane Florence shutdown.

NC_McGuire_2 @ 98 % [ coastdown to RFO 20180915 ]

FL_Saint_Lucie_2 @ 0 % [ RPV OPEN ( RFO ) ]

TN_Watts_Bar_1 @ 95 % [ coastdown to RFO 20180918 ]



Region 3


IL_Byron_1 @ 0 % [ RPV OPEN ( RFO ) ]

IL_Clinton_1 @ 94 % down frm 98 % ; 98 % Sunday up from 95 % Saturday , no EN, reason for power drop unk. [ 99 % is this units normal max power ]

IL_Dresden_3 @ 97 % [ coastdown to RFO 20181031 ]

IA_DuaneArnold_1 @ 0 % [ RPV OPEN ( RFO )  ], last RFO ref Closing announcement.

OH_Perry_1 @ 96 % dwon from 100 % , no EN, reason for power drop unk.

WI_Point_Beach_1 @ 100 % up from 66 % , no EN, reason for power drop unk.

MN_Prairie_Island_1 @ 83 % [ coastdown to RFO 20180921 ]



Region 4

NE_Cooper_1 @ 91 % [ coastdown to RFO 20180929 ]


----------------------------------------------------------------------------------------------------------------------------------------------------

[ There are currently 3 units with the RPV open - ref the 2018 Fall Refueling Outage Schedule and Status ]