NPS_Watch Sep 12, 2018
#1
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 5 EN(s) today, 5 associated with power stations.

[  ]

NRC Event Notices for September 12, 2018 |
https://www.nrc.gov/reading-rm/doc-colle...912en.html

[ event times not entered ]

----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for FL_SaintLucie_2 ]

20180911 | FL_SaintLucie_2 | WELD DEFECT ON PRESSURIZER INTERFACE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53598
[ RFOD_016; RxMode   ; Rx Mode: Defueled; (Rx Mode data missing on NRC EN) ]

[ Rx Mode info missing in EN status box for this EN only. Body of EN contains RX Mode info : Defueled ]


"At 2200 EDT on September 11, 2018,
during inspections as part of the pressurizer bare metal inspection program,
an apparent weld defect was identified on Class 1 pressurizer level piping at the piping to pressurizer interface.

The reactor is currently defueled in a refueling outage.

Appropriate repairs will be made during the refueling outage."

NRC Resident Inspector has been notified.

[ Unclear if the weld defect was a pre-existing condition or if it was created during RFO repairs. ]

----------- [ 2018 event history for FL_SaintLucie ]


20180827 | FL_SaintLucie_2 | Begin RFO



20180413 | FL_SaintLuccie_1 | Achieved full pwr [ 02 ]

20180411 | FL_SaintLuccie_1 | Exit RFO [ 31 / 29 ]

20180315 | FL_SaintLucie_1;2 | DEFECT REGARDING CERTAIN PRESSURE TRANSMITTERS AND AMPLIFIER CIRCUIT CARD ASSEMBLIES |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53263

20180313 | FL_SaintLucie_1;2 | FITNESS FOR DUTY - NON-LICENSED SUPERVISOR TESTED POSITIVE FFD TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53260
[ RFOD_002; Rx Mode: Cold Shutdown ; Rx Mode: Cold Shutdown ]

20180311 | FL_SaintLuccie_1 | Begin RFO

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for MN_Monticello_1 ]

20180911 | MN_Monticello_1 | UNANALYZED CONDITION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53597

"On 9/10/2018, the 11 [ pronounced One One ] Core Spray (CSP) loop was placed in service to support quarterly surveillance testing.

 With the 11 CSP pump in service it was identified that the check valves isolating the 11 CSP system from the keep fill supply were leaking by.

At 1129 CDT on 9/11/2018,

it was identified that this leakage may have exceeded the leakage rate assumptions made in the dose analysis calculation
for emergency core cooling system (ECCS) leakage outside containment following a loss of coolant accident (LOCA).

Therefore, this is being reported in accordance with 10 CFR 50.72(b)(3)(ii)(B) for an unanalyzed condition that significantly degrades plant safety
and 10 CFR 50.72(b)(3)(v) for any event or condition that at the time of discovery could have prevented the fulfillment
of the safety function of structures or systems that are needed to: © Control the release of radioactive material; or (D) Mitigate the consequences of an accident.

"The potential ECCS leak pathway has been isolated.
[ It wasn't 'potential', it was leaking. ]

There is no impact to health and safety of the public.
[ Even tho' it was outside containment ? ]

"The NRC Resident Inspector has been notified."

[ Notice there's no value as to amount of leakage or the radioactivity level. ]

----------- [ 2018 event history for MN_Monticello ]

20180323 | MN_Monticello_1 | LOSS OF EMERGENCY ASSESSEMENT CAPABILITY     
https://www.nrc.gov/reading-rm/doc-colle...ml#en53285

20180201 | MN_Monticello_1 | PART-21 NOTIFICATION - IMPROPER LUGS IN A BREAKER CUBICLE     
https://www.nrc.gov/reading-rm/doc-colle...ml#en53193


----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for GA_Vogtle_3,4 ]

20180911 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR TESTS POSITIVE ON FITNESS-FOR-DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53595

"At 1430 EDT on September 11, 2018, Southern Nuclear Operating Company (SNC) determined a contractor supervisor
confirmed positive for drugs during a Fitness-for-Duty (FFD) test.

The employee's unescorted access to the plant has been suspended.

The NRC Resident Inspector has been notified."

----------- [ 2018 event history for GA_Vogtle ]

20180824 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR SUBVERTS A FOLLOW-UP FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53563

20180808 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR TESTS POSITIVE FOR ALCOHOL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53538

20180727 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR TESTS POSITIVE FOR ALCOHOL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53528

20180726 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR SUBVERTS A FOR-CAUSE FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53526

20180718 | GA_Vogtle_3,4 | NON-LICENSED CONTRACT SUPERVISOR SUBVERTS FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53517

20180718 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR TESTED POSITIVE FOR ALCOHOL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53515

20180717 | GA_Vogtle_3,4 | NON-LICENSED CONTRACT SUPERVISOR TESTS POSITIVE ON FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53511

20180709 | GA_Vogtle_3,4 | CONTRACTOR SUPERVISOR TESTS POSITIVE ON FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53499

20180703 | GA_Vogtle_1 | MANUAL REACTOR TRIP DUE TO HIGH STEAM GENERATOR WATER LEVEL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53484

20180628 | GA_Vogtle_3,4 | FITNESS-FOR-DUTY TEST POSITIVE FOR NON-LICENSED SUPERVISOR |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53479

20180622 | GA_Vogtle_3;4 | NON-LICENSED SUPERVISORY CONTRACTOR SUBVERTS FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53469

20180516 | GA_Vogtle_3;4 | FITNESS-FOR-DUTY TEST POSITIVE FOR NON-LICENSED SUPERVISOR |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53403

20180402 | GA_Vogtle_3;4 | CONTRACTOR SUPERVISOR TESTS POSITIVE DURING FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53309

20180321 | GA_Vogtle_3;4 | FITNESS FOR DUTY TEST SUBVERSION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53277
[ This EN has been removed from the NRC website ]

20180220 | GA_Vogtle_3;4 | FITNESS FOR DUTY - CONTRACT SUPERVISOR SUBVERTS FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53221


----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for PA_PeachBttom_2;3 ]

20180911 | PA_PeachBttom_2;3 | TECHNICAL SUPPORT CENTER VENTILATION NON-FUNCTIONAL |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53594

"On September 11, 2018 the Technical Support Center (TSC) ventilation was discovered to be non-functional during system testing.

At 1310 EDT, an air leak was identified that prevented the modulating dampers to operate as designed to maintain required pressure. The air leak was not able to be repaired within a 60 minute period.

This failure affected the ability of the TSC ventilation system to maintain adequate radiological habitability in the event of an emergency with an airborne radiological release.

All other capabilities of the TSC are unaffected by this emergent condition.

The air leak has been repaired and post maintenance testing was completed satisfactory at 1654 [EDT], restoring the TSC ventilation to a functional condition.

"This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to the potential loss of an emergency responsefacility because of the unavailability of the ventilation system."

The NRC Resident Inspector has been notified.

----------- [ 2018 event history for PA_PeachBttom ]

20180315 | PA_PeachBttom_2;3 | FAILURE TO MEET APPENDIX R REQUIREMENTS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53265


----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for TN_WattsBar_1 ]

20180911 | TN_WattsBar_1 | CONTROL ROOM EMERGENCY VENTILATION SYSTEM INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53593

"At 0113 EDT on September 11, 2018,
it was discovered both trains of CREVS [control room emergency ventilation system] were simultaneously inoperable;
therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v).

"There was no impact on the health and safety of the public or plant personnel.

"The NRC Resident Inspector has been notified."

The door to the main control room habitability zone from the turbine building was left open and unattended for about a minute,
breaking the pressure boundary in the room, resulting in an alarm.

The door was closed, clearing the alarm and the CREVS was considered operable.


----------- [ 2018 event history for TN_WattsBar ]

20180822 | TN_WattsBar_2 | AUTOMATIC REACTOR TRIP |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53557

20180622 | TN_WattsBar_2 | AUTOMATIC REACTOR TRIP |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53467

20180605 | TN_WattsBar_1;2 | Retract UNANALYZED CONDITION RELATED TO EMERGENCY CORE COOLING GAS ACCUMULATION ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53349
 
20180530 | TN_WattsBar_1;2 | NRC to Hold Open House to Discuss 2017 Performance of Watts Bar Nuclear Power Plant |
https://www.nrc.gov/reading-rm/doc-colle...027.ii.pdf

20180511 | TN_WattsBar_2 | CONTAINMENT SHIELD BUILDING INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53398

20180510 | TN_WattsBar_1 | Retract BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53355

20180504 | TN_WattsBar_2 | Retract BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53356

20180430 | TN_WattsBar_1;2 | NRC Launches Special Inspection at Watts Bar Nuclear Power Plant |
https://www.nrc.gov/reading-rm/doc-colle...021.ii.pdf

20180422 | TN_WattsBar_2 | BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53356

20180421 | TN_WattsBar_1 | BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53355

20180419 | TN_WattsBar_1;2 | UNANALYZED CONDITION RELATED TO EMERGENCY CORE COOLING GAS ACCUMULATION ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53349

20180412 | TN_WattsBar_2 | AUTOMATIC REACTOR TRIP |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53327

20180329 | TN_WattsBar_1 | Retract FAILURE OF CONTAINMENT PENETRATION THERMAL RELIEF CHECK VALVES TO MEET SURVEILLANCE ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53196

20180326_1839_EDT | TN_WattsBar_1 | TEMPORARY LOSS OF CONTROL ROOM ENVELOPE BOUNDARY |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53291

20180326_1058_EDT | TN_WattsBar_1 | TEMPORARY LOSS OF CONTROL ROOM ENVELOPE BOUNDARY |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53288

20180204 | TN_WattsBar_1 | FAILURE OF CONTAINMENT PENETRATION THERMAL RELIEF CHECK VALVES TO MEET SURVEILLANCE ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53196

20180117 | TN_WattsBar_1 | SHIELD BUILDING INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53173



--------------------------------------------------------------------------------------------------
----------- [ Part 21 Notice ]


----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------

[ the asterisk signifies that an uptick in rad detection at nearby EPA radmon stations was observed on NETC. ]
[ NETC reflecting EPA stn data ]


Region 1

MD_Calvert_Cliffs_1 @ 100 % up ffrom 84 % ; 79 % ; 100 % Sunday , no EN, reason for power drop unk.

MD_Calvert_Cliffs_2 @ 83 % down from 100 % , no EN, reason for power drop unk.

NY_Fitzpatrick_1 @ 0 % [ begin RFO 20180910 ]

NY_Indian_Point_2 @ 0 % TECHNICAL SPECIFICATION REQUIRED SHUTDOWN |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53589

NJ_Oyster_Creek_1 @ 70 % unch from 70 % Jul 29 [ coastdown to permanent shutdown 20180917 ]

PA_Peach_Bottom_2 @ 96 % [ coastdown to RFO 20181015 ]  

PA_Peach_Bottom_3 @ 97 % dwon from 98 % ; 84 % ; 62 % Sunday ; 36 % Saturday , no EN, reason for power drop unk.

MA_Pilgrim_1 @ 90 % up from 85 % ; 72 % unch from 72 % Saturday , no EN, cooling water too warm.

NJ_Salem_2 @ 93 %  [ coastdown to RFO 20181011 ]


Region 2

AL_BrownsFerry_1 @ 79 % unch from 79 % since Friday 20180810 , no EN, reason for power drop unk.
[ RFO 20181011 ]

NC_McGuire_2 @ 100 % up from 99 %  [ coastdown to RFO 20180915 ]

FL_Saint_Lucie_2 @ 0 % [ RPV OPEN ( RFO )  ]

TN_Sequoyah_2 @ 100 % up from 65 % , no EN, reason for power drop unk.

TN_Watts_Bar_1 @ 100 % up from 97 % [ coastdown to RFO 20180918 ]



Region 3


IL_Byron_1 @ 0 % [ Begin RFO 20180910 ]

IL_Clinton_1 @ 98 % unch from 98 % Sunday up from 95 % Saturday , no EN, reason for power drop unk. [ 99 % is this units normal max power ]

IL_Dresden_3 @ 98 % [ coastdown to RFO 20181031 ]

IA_DuaneArnold_1 @ 0 % [ RPV OPEN ( RFO )  ], last RFO ref Closing announcement.

MN_Prairie_Island_1 @ 84 % [ coastdown to RFO 20180921 ]



Region 4

NE_Cooper_1 @ 92 % [ coastdown to RFO 20180929 ]


----------------------------------------------------------------------------------------------------------------------------------------------------

[ There are currently 2 units with the RPV open - ref the 2018 Fall Refueling Outage Schedule and Status ]

posted by Staup Knewkinus a Dane Gerous production. All human rights reserved.
 