NPS_Watch Jun 25, 2018
#1
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.


There are 3 EN(s) today, 2 associated with power stations.

[ Lot of unreported ( no Event Notification ) activity over the weekend, see the 'Other reactor info from daily power tracking ' section. ]

NRC Event Notices for June 25, 2018  
https://www.nrc.gov/reading-rm/doc-colle...625en.html
[ page nav working, event dates entered, event times not entered, not posted until 11 am EDT ]
----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for GA_Vogtle_3;4 ]

20180622 | GA_Vogtle_3;4 | NON-LICENSED SUPERVISORY CONTRACTOR SUBVERTS FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53469

"At 0900 [EDT] on June 22, 2018, a non-licensed supervisory contractor subverted a random Fitness for Duty test. The contractor's site access has been terminated.

The NRC Resident Inspector was notified. "

[ Notice the frequency of supervisors failing FFD, the frequency of subverting testing. Seems like a monthly thing. ]
[ If the supervisors are doing this, how many of the workers are going undetected? ]

----------- [ 2018 event history for GA_Vogtle ]

20180516 | GA_Vogtle_3;4 | FITNESS-FOR-DUTY TEST POSITIVE FOR NON-LICENSED SUPERVISOR |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53403

20180402 | GA_Vogtle_3;4 | CONTRACTOR SUPERVISOR TESTS POSITIVE DURING FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53309

20180321 | GA_Vogtle_3;4 | FITNESS FOR DUTY TEST SUBVERSION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53277
[ This EN has been removed from the NRC website ]

20180220 | GA_Vogtle_3;4 | FITNESS FOR DUTY - CONTRACT SUPERVISOR SUBVERTS FITNESS FOR DUTY TEST |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53221


--------------------------------------------------------------------------------------------------
----------- [ Current event for TN_WattsBar_2 ]

20180622 | TN_WattsBar_2 | AUTOMATIC REACTOR TRIP |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53467

"At 0841 EDT on June 22, 2018, the Watts Bar Unit 2 reactor automatically tripped while operating at 95% power.

[ This unit was experiencing some kind of problem beginning last week. On Thursday power was reported at 60 %, no EN was filed. ]
[ On Friday they reported 85 % in the AM as they tried to bring the unit back to full power but then the unit scrammed. ]
[ The unit reports 0 % power as of this morning. ]

All control and shutdown bank rods inserted properly in response to the automatic reactor trip.

All safety systems including Auxiliary Feedwater actuated as designed.

The plant is stable with decay heat removal through Auxiliary Feedwater and Steam Dump Systems.
[ Unclear if these are steam dumps to the atmosphere or to the main condenser. ]


"The reactor automatically tripped due to a main turbine trip.
The turbine trip was caused by main generator electrical trip.
An investigation is in progress.

"The automatic actuation of the Reactor Protection System (RPS) is being reported as a four hour report under 10 CFR 50.72 (b)(2)(iv)(B).
"The expected actuation of the Auxiliary Feedwater System (an engineered safety feature) is being reported as an eight hour report under 10 CFR 50.72 (b)(3)(iv)(A).

"The NRC Senior Resident Inspector has been notified for this event."

The plant is currently stable at normal operating temperature and pressure.
The grid is stable and the plant is in its normal shutdown electrical lineup.
Unit 1 was unaffected by the Unit 2 trip.

----------- [ 2018 event history for TN_WattsBar ]

20180605 | TN_WattsBar_1;2 | Retract UNANALYZED CONDITION RELATED TO EMERGENCY CORE COOLING GAS ACCUMULATION ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53349
 
20180530 | TN_WattsBar_1;2 | NRC to Hold Open House to Discuss 2017 Performance of Watts Bar Nuclear Power Plant |
https://www.nrc.gov/reading-rm/doc-colle...027.ii.pdf

20180511 | TN_WattsBar_2 | CONTAINMENT SHIELD BUILDING INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53398

20180510 | TN_WattsBar_1 | Retract BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53355

20180504 | TN_WattsBar_2 | Retract BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53356

20180430 | TN_WattsBar_1;2 | NRC Launches Special Inspection at Watts Bar Nuclear Power Plant |
https://www.nrc.gov/reading-rm/doc-colle...021.ii.pdf

20180422 | TN_WattsBar_2 | BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53356

20180421 | TN_WattsBar_1 | BOTH TRAINS OF RESIDUAL HEAT REMOVAL INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53355

20180419 | TN_WattsBar_1;2 | UNANALYZED CONDITION RELATED TO EMERGENCY CORE COOLING GAS ACCUMULATION ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53349

20180412 | TN_WattsBar_2 | AUTOMATIC REACTOR TRIP |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53327

20180329 | TN_WattsBar_1 | Retract FAILURE OF CONTAINMENT PENETRATION THERMAL RELIEF CHECK VALVES TO MEET SURVEILLANCE ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53196

20180326_1839_EDT | TN_WattsBar_1 | TEMPORARY LOSS OF CONTROL ROOM ENVELOPE BOUNDARY |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53291

20180326_1058_EDT | TN_WattsBar_1 | TEMPORARY LOSS OF CONTROL ROOM ENVELOPE BOUNDARY |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53288

20180204 | TN_WattsBar_1 | FAILURE OF CONTAINMENT PENETRATION THERMAL RELIEF CHECK VALVES TO MEET SURVEILLANCE ACCEPTANCE CRITERIA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53196

20180117 | TN_WattsBar_1 | SHIELD BUILDING INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53173



--------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2018 event history for
--------------------------------------------------------------------------------------------------
----------- [ Part 21 Notice ]
----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------

[ the asterisk signifies that an uptick in rad detection at nearby EPA radmon stations was observed on NETC. ]
[ Working on data gathering to present findings, hope to provide more detail later today. ]

Region 1

*NY_FitzPatrick_1 @ 100 %, 100 % Sunday, 79 % on Saturday dwon from 99 % ; 99 % 99 %, no EN, reason for power drop unk.

*NY_Indian_Point_2 @ 100 %, dropped to 62 % on Saturday, no EN, reason for power drop unk.

*MA_Pilgrim_1 @ 98 %, dropped to 90 % on Saturday, no EN, reason for power drop unk.



Region 2


AL_Browns_Ferry_3 @ 96 % up from 94 % ; 94 % ; 94 % ; 91 % ; 79 % : 52 % ; 52 % Saturday, no EN, reason for power drop unk.  
[ Unit unable to achieve full power since exiting RFO Apr 03 ] ( used 45 of typ 43 days )

NC_Brunswick_2 @ 0 % reported 0 % Sunday and 15 % Saturday, no EN, reason for shutdown unk.

SC_Robinson_2 @ 100 %, reached 100 % Saturday, up from 35 % ; 0 % shutdown 06/15, no EN, reason for power drop unk.

*FL_TurkeyPoint_4 @ 100 % reached 100 % Saturday up from 75 %, no EN, reason for power drop unk.

*TN_Watts_Bar_2 @ @ 0 % 0 % ; 0 % ; 85 % ; 60 %, no EN, reason for original power drop unk. [ see EN above ]



Region 3

*IL_Braidwood_2 @ 100 % up from 94 % Sunday, no EN, reason for power drop unk.

*MI_Fermi_2 @ 100 % up from 62 % Sunday, no EN, reason for power drop unk.



Region 4

*AR_Arkansas_1 @ 0 % no EN, reason for shutdown unk.
Last weeks power reports 68 % ; 65 % ; 40 % ; 2 % ; 0 % ; 0 %,
recovering from MANUAL REACTOR TRIP DURING STARTUP     
https://www.nrc.gov/reading-rm/doc-colle...ml#en53459

*NE_Cooper_1 @ 100 % up from 87 % Sunday, no EN, reason for power drop unk.

TX_SouthTexas_1 @ 62 % down from 100 %, no EN, reason for pwer drop unk.



----------------------------------------------------------------------------------------------------------------------------------------------------

[ There are currently 0 units with the RPV open - ref the Current ReFueling Outage Schedule and Status ]

posted by Staup Knewkinus a Dane Gerous production. All human rights reserved.
 