DD_20180425
================

The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.


There are 2 EN(s) today, 1 associated with power stations.

NRC Event Notices for April 25, 2018         
https://www.nrc.gov/reading-rm/doc-colle...425en.html

--------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
--------------------------------------------------------------------------------------------------

----------- [ Current event for CA_DiabloCanyon_2 @ 100 % RX Mode: Power Op ]

20180424 | CA_DiabloCanyon_2 | CONTAINMENT RADIATION MONITORS INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53361

"At 0357 [PDT], Unit 2 Containment High Range Radiation Monitor RM-31 was declared inoperable due to erratic indication. At this time, Containment High Range Radiation Monitor RM-30 was out of service for routine calibration.

"With both containment high range radiation monitors inoperable, this impacted DCPP's [Diablo Canyon Power Plant's] ability to evaluate containment radiation data for an unmonitored release in the event of an emergency. Compensatory measures were promptly put in place with the use of a portable radiation monitor as required by emergency preparedness procedures.

"This condition is being reported as a loss of assessment capability in accordance with 10 CFR 50.72(b)(3)(xiii).

"Actions are in progress to restore RM-30 and RM-31 to operable status.

"The NRC Senior Resident Inspector has been notified."

* * * UPDATE ON 4/24/18 AT 1716 EDT FROM ERIC THOMAS TO DONG PARK * * *

RM-30 was restored to service. Portable radiation monitoring is not required.

The licensee will notify the NRC Resident Inspector. Notified R4DO (Vasquez).


----------- [ 2018 event history for CA_DiabloCanyon ]

20180125_1901_PST | CA_DiabloCanyon_1 | OFFSITE NOTIFICATION DUE TO SCREEN WASH PUMP MOTOR FIRE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53184


-----------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------

Region 1

NY_IndianPoint_2 @ 100 % up from 92 % Completed RFO ( used 31 of typ 31 )




Region 2

AL_Browns_Ferry_3 @ 85 % up from 84 % ( used 45 of typ 43 days )
[ This unit has not been able to achieve full power since exiting RFO Apr 03 ]

GA_Hatch_2 @ 88 % up from 50 % - no EN, reason for power drop unknown. 7th day.

SC_Oconee_3 RPV Opened

VA_Surry_1 RPV_Opened


Region 3

IL_Clinton_1 was due to begin 4/20, is in coastdown, may have been a sched change.

MI_Fermi_2 @ 0 % 11th day down
AUTOMATIC REACTOR SCRAM AND EMERGENCY CORE COOLING SYSTEM INJECTION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53336


Region 4


[ There are currently 15 units with the RPV open - ref the Current ReFueling Outage Schedule and Status ]