NPS_Watch Jun 13, 2018
#1
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 1 EN(s) today, 1 associated with power stations.


NRC Event Notices for June 13, 2018    
https://www.nrc.gov/reading-rm/doc-colle...613en.html
[ page nav working, event date/time not entered ]
----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for AR_Arkansas_1 ]

20180612 | AR_Arkansas_1 | PRESSURE BOUNDARY LEAKAGE IDENTIFIED WHILE SHUTDOWN |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53456

"On June 12, 2018, at 1500 CDT,
a Reactor Coolant System (RCS) Pressure Boundary leak was identified during a Mode 3, hot shutdown walkdown
on a High Pressure Injection Line [HPI] to Reactor Coolant Pump (P32C) drain line weld near MU-1066A HPI Line Drain Valve and MU-1066B HPI Line Drain Valve.

The 3/4 inch drain line containing drain valves MU-1066A and MU-1066B on the 'C' HPI header (CCA-5 pipe class)
has a through-wall defect
[ a through-wall defect is a way of saying there's a hole in the pipe ]

on the pipe stub or welds between the sockolet and valve MU-1066A.
[ they aren't sure exactly where the hole is ]

The leak location is in the ASME Class I RCS Pressure Boundary.
[ this is the primary loop, so rad contaminated water. ]

"The hot shutdown walkdown was being performed as part of a planned outage to investigate excessive Reactor Building Sump inleakage.
[ So they planned on having a leak after the RFO and shutting down ? ]


Total unidentified RCS leakage prior to the investigation was determined to be at 0.165 gpm.
[ Does this mean there's identified leakage ? If so, what's that value? ]
[ no total amount, .165gpm doesn't seem like much until we look at how long the unit has been operating since restarting. ]
[ .165 x 60 x 24 = 237 gallons per day ]
[ The restart date was 05/21, as the power tracking observations have noted the unit was unable to achieve full power after RFO. ]
[ so 23 days leaking = 5,464 gallons, but maybe 5k gals of rad contaminated water isn't that much.  ]

After the initial investigation of the leakage, the following Tech Specs [TS] were determined be applicable:
TS 3.4.5 - RCS Loops Mode 3,
TS 3.4.13 - RCS Leakage,
TS 3.5.2 - ECCS.
[ So they looked in the owners manual to see if they HAD to shutdown and found out that yeah they had to. ]


Unit 1 is currently in Mode 3 and in progress of an RCS cooldown to comply with Tech Spec requirements."
[ this may mean they have to drain some of the coolant to be able to fix the leak or that they have to cool down to relieve pressure and so workers can get near the leaking component. ]

The licensee notified the NRC Resident Inspector.  

[ Notice that the usual statement about there being no release of rad material to the environment is missing. ]


----------- [ 2018 event history for AR_Arkansas ]

20180516 | AR_Arkansas_1 | AUTOMATIC REACTOR TRIP DUE TO LOSS OF MAIN FEEDWATER PUMP |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53404

20180508 | AR_Arkansas_1 | 0 % reason for SD unk

20180507 | AR_Arkansas_1 | Exit RFO @ 100 %

20180325 | AR_Arkansas_1 | Begin RFO

20180315 | AR_Arkansas_1;2 | DEFECT REGARDING CERTAIN PRESSURE TRANSMITTERS AND AMPLIFIER CIRCUIT CARD ASSEMBLIES |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53263


--------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2018 event history for

--------------------------------------------------------------------------------------------------
----------- [ Part 21 Notice ]
----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------

[  ]


Region 1


PA_Peach_Bottom_3 @ 100 % up from 81 % ; 93 % ; 63 % ; 46 % ; 42 % Friday, no EN, reason for power drop unk.

MA_Pilgrim_1 @ 98 % down from 99 % ; 99 % ; 98 %, no EN, reason for power drop unk.




Region 2


AL_Browns_Ferry_3 @ 92 %
[ Unit unable to achieve full power since exiting RFO Apr 03 ] ( used 45 of typ 43 days )

NC_Brunswick_2 @ 100 % up from 87 % ; 96 % ; 87 % ; 68 % Sunday, no EN, reason for drop unk.



Region 3




Region 4

AR_Arkansas_1 @ 0 % down from 98 % ; 98 % ; 98 % : 98 % ; 97 % ; RFO restart ( used 44 of typ 35 )
[ unit unable to achieve full power after RFO ]

WA_Columbia_2 @ 98 % down from 100 % ; 85 %

--------------------------------------------------------------------------------------------------------------------------------------------------

[ There are currently 0 units with the RPV open - ref the Current ReFueling Outage Schedule and Status ]

posted by Staup Knewkinus a Dane Gerous production. All human rights reserved.
 
Reply
  


Messages In This Thread
NPS_Watch Jun 13, 2018 - Staup - 06-13-2018, 10:31 AM

Possibly Related Threads...
Thread Author Replies Views Last Post
  NPS_Watch Jun 22, 2018 Staup 0 55 Yesterday, 10:37 AM
Last Post: Staup
  NPS_Watch Jun 21, 2018 Staup 0 52 06-21-2018, 10:21 AM
Last Post: Staup
  NPS_Watch Jun 20, 2018 Staup 0 30 06-20-2018, 10:30 AM
Last Post: Staup
  NPS_Watch Jun 19, 2018 Staup 0 83 06-19-2018, 09:10 AM
Last Post: Staup
  NPS_Watch Jun 18, 2018 Staup 0 29 06-18-2018, 11:57 AM
Last Post: Staup
  NPS_Watch Jun 15, 2018 Staup 0 79 06-15-2018, 10:01 AM
Last Post: Staup
  NPS_Watch Jun 14, 2018 Staup 0 52 06-14-2018, 07:58 AM
Last Post: Staup
  NPS_Watch Jun 12, 2018 Staup 0 98 06-12-2018, 12:04 PM
Last Post: Staup
  NPS_Watch Jun 11, 2018 Staup 0 84 06-12-2018, 12:00 PM
Last Post: Staup
  NPS_Watch Jun 08, 2018 Staup 0 92 06-08-2018, 09:23 AM
Last Post: Staup

Forum Jump:


Browsing: 1 Guest(s)