Cafe RadLab

Full Version: NPS_Watch Apr 08, 2019
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 5 EN(s) today, 1 associated with power stations.

[  ]

NRC Event Notices for April 08, 2019 |
https://www.nrc.gov/reading-rm/doc-colle...408en.html

[  ]

--------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
--------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for MI_Fermi_2 ]

20190405 | MI_Fermi_2 | FITNESS-FOR-DUTY: FALSIFIED PRE-EMPLOYMENT INFORMATION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53982


A non-licensed employee falsified pre-employment information.

The employee's access to the plant has been terminated.


----------- [ 2019 event history for MI_Fermi ]

20190403 | MI_Fermi_2 | PART 21 REPORT - RESIDUAL HEAT REMOVAL SYSTEM MOTOR OPERATED GLOBE VALVE EXPERIENCED STEM FAILURES |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53973

20190311 | MI_Fermi_2 | PART 21 REPORT - IMPROPER ANTI-ROTATION KEY DIMENSION ON GLOVE VALVE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53928

20190219 | MI_Fermi_2 | SECONDARY CONTAINMENT INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53883

20190130 | MI_Fermi_2 | Retract HPCI INOPERABLE DUE TO MECHANICAL DRAFT COOLING TOWER FAN BRAKE INVERTER FAILURE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53772

20190108 | MI_Fermi_2 | NRC Names New Resident Inspector at Fermi Nuclear Power Station
https://www.nrc.gov/reading-rm/doc-colle...01.iii.pdf

20190116 | MI_Fermi_2 | SIGNIFICANT FITNESS-FOR-DUTY POLICY VIOLATION |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53830

20190114 | MI_Fermi_2 | ACTIVE SEISMIC MONITORING SYSTEM INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53825

20190111 | MI_Fermi_2 | FITNESS FOR DUTY |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53822


20190107 | MI_Fermi_2 | 100 % power

20190101 | MI_Fermi_2 | GLAND SEAL EXHAUSTER - AUTOMATIC TRIP FUNCTION INOPERABLE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53811


----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2019 event history for

----------------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2019 event history for
[ no previous ENs for this unit in 2019 ]

----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
------------[ PART 21 ] - These ENs are for issues that involve multiple site/reactor units
----------------------------------------------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------


Region 1
 
NJ_Hope_Creek_1 @ 100 % unch from 100 % Sunday; 70 % Saturday
[ no EN, unk reason for shutdown. ]

NY_Indian_Point_2 @ 100 % Saturday up from 12 %
[ no EN, unk reason for shutdown. ]

recently recovered from
 REACTOR AUTOMATIC TRIP ON TURBINE TRIP |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53954
 
NY_Indian_Point_3 @ 0 % [ RPV OPEN ( 29 / 30 ) 20190312 ]

PA_Limerick_2 @ 86 % [ coastdown to RFO 20190415 ]

CT_Millstone_3 @ 90 % [ coastdown to RFO 20190418 ]

NY_Nine_Mile_Point_1 @ 0 % [ RPV OPEN ( 22 / 21 ) ] missed planned restart

MA_Pilgrim_1 @ 98 % unch from 98 % Saturday
[ no EN, unk reason for power drop. Coastdown to permanent shutdown ? ]

NJ_Salem_1 @ 70 % [ coastdown to RFO 20190426 ]

PA_Susquehanna_2 @ 0 % [ RPV OPEN ( 17 / 35 ) 20190323 ]


Region 2

AL_Browns_Ferry_2 @ 0 % [ RPV OPEN ( 38 / 25 ) ] missed planned restart date ]

NC_Brunswick_1 @ 0 % unch from 0 % 20190329
 AUTOMATIC ACTUATION OF THE PRIMARY CONTAINMENT ISOLATION SYSTEM AND THE REACTOR PROTECTON SYSTEM |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53962

 UNUSUAL EVENT DECLARED DUE TO RCS UNIDENTIFIED LEAKAGE |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53961

NC_Brunswick_2 @ 0 % unch from 0 % 20190331 [ exit RFO ( 28 / 28 ) ]
 MANUAL REACTOR SCRAM AND SPECIFIED SYSTEM ACTUATION |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53966

AL_Farley_2 @ 0 % [ Begin RFO ( 01 / 28 ) 20190405 ]
[ Expect RPV OPEN Friday. ]

NC_McGuire_1 @ 0 % [ RPV OPEN ( 17 / 31 ) 20190323 ]

VA_NorthAnna_2 @ 0 % [ RPV OPEN ( 37 / 36 ) ] missed planned restart date

FL_Turkey_Point_4 @ 0 % [ RPV OPEN ( 29 / 28 ) 20190311, missed planned restart date ]


Region 3

IL_Byron_2 @ 0 % [ Begin RFO ( 01 / 18 ) 20190408 ]
[ Expect RPV OPEN Friday. ]

IL_Clinton_1 @ 98 %
[ no EN, 98-99 % are this units normal thermal power range. ]

MI_DC_Cook_1 @ 0 % [ RPV OPEN ( 34 / 30 ) 20190306  ]
[ missed planned restart date ]

MN_Monticello_1 @ 74 %  [ coastdown to RFO 20190413 ]

OH_Perry_1 @ 37 % up from 19 % Sunday; 5 % Saturday [ Exit RFO ( 27 / 34 ) 20190309 ]

WI_Point_Beach_1 @ 0 % [ RPV OPEN ( 17 / 26 ) 20190322 ]

IL_Quad_Cities_1 @ 41 % up from 12 % [ Exit RFO ( 20 / 20 ) 20190318 ]


Region 4

MO_Callaway_1 @ 0 % [ RPV OPEN ( 07 / 42 ) 20190401; no coastdown 24hr SD

TX_ComanchePeak_1 @ 85 % [ coastdown to RFO 20190407 ] missed planned start date ]

CA_DiabloCanyon_2 @ 100 % unch from 100 % Sunday; 50 % Saturday
[ no EN, unk reason for power drop. ]

AZ_PaloVerde_1 @ 0 % [ Begin RFO ( 03 / 30 ), no coastdown, slamdown Friday
[ Expect RPV OPEN Wednesday ]

LA_RiverBend_1 @ 0 % [ RPV OPEN ( 10 / 34 ]


----------------------------------------------------------------------------------------------------------------------------------------------------

[ There is/are currently 11 unit(s) with the RPV OPEN - ref the 2019 Spring Refueling Outage Schedule and Status ]

posted by Staup Knewkinus a Dane Gerous production. All human rights reserved.