Cafe RadLab

Full Version: NPS_Watch Mar 15, 2019
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 4 EN(s) today, 1 associated with power stations.

[  ]

NRC Event Notices for March 15, 2019 |
https://www.nrc.gov/reading-rm/doc-colle...315en.html

[  ]

--------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
--------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for PA_PeachBottom_2;3 ]

20190314 | PA_PeachBottom_2;3 | FITNESS FOR DUTY REPORT - LICENSED EMPLOYEE FAILED A RANDOM SCREENING |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53933

A licensed employee was determined to be under the influence of alcohol during a random test.

The employee's access to the plant has been suspended pending an investigation.

The licensee notified the NRC Resident Inspector.

[
Doesn't specify what kind of licensed activity. Licensed janitor, carpenter, welder, reactor operator, supervisor, ?
EN states time approx 0930 so might have been some breakfast mamosa's.
]
 

----------- [ 2019 event history for PA_PeachBottom ]

[ No previous ENs for this year. ]


----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2019 event history for

----------------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2019 event history for

----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2019 event history for
[ No previous ENs for this year. ]
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
------------[ PART 21 ] - These ENs are for issues that involve multiple site/reactor units
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------


Region 1
 
MD_Calvert_Cliffs_2 @ 0 % [ RPV OPEN ( 26 / 22 ) 20190218 ]
[ missed planned restart date ]

NY_Indian_Point_3 @ 0 % [ RPV OPEN ( 05 / 30 ) 20190312 ]

PA_Limerick_2 @ 96 % [ coastdown to RFO 20190415 ]

NY_Nine_Mile_Point_1 @ 83 % [ coastdown to RFO 20190320 ]

NJ_Oyster_Creek_1 @ 0 % [ RPV CLOSED , defueled , permanent shutdown ]

NJ_Salem_1 @ 83 % [ coastdown to RFO 20190426 ]

PA_Susquehanna_2 @ 82 % [ coastdown to RFO 20190323 ]


Region 2

AL_Browns_Ferry_2 @ 0 % [ RPV OPEN ( 14 / 25 ) ]

AL_Browns_Ferry_3 @ 19 % up from 0 % unch from 0 % Sunday; 100 % Saturday
 AUTOMATIC SCRAM RESULTING IN RPS AND ECCS ACTUATION |
 https://www.nrc.gov/reading-rm/doc-colle...ml#en53923

NC_Brunswick_2 @ 0 % [ RPV OPEN ( 14 / 28 ) ]

GA_Hatch_2 @ 0 % [ RPV OPEN ( 40 / 20 ) ] [ 20190204 shutdown early ]
[ missed planned restart date ]

NC_McGuire_1 @ 94 % [ coastdown to RFO 20190323 ]

VA_NorthAnna_2 @ 0 % [ RPV OPEN ( 13 / 36 ) ]

FL_Turkey_Point_4 @ 0 % [ RPV OPEN ( 05 / 28 ) 20190311 ]

GA_Vogtle_2 @ 0 % [ RPV OPEN ( 05 / 20 ) 20190310 ]


Region 3

IL_Clinton_1 @ 98 % unch from 98 % Sunday;
[ units normal operating range ]

MI_DC_Cook_1 @ 0 % [ RPV OPEN ( 10 / 90 ) 20190306  ]

IL_La_Salle_2 @ 98 % [ Exit RFO ( 20 / 35 ) 20190218 ]

MN_Monticello_1 @ 81 %  [ coastdown to RFO 20190413 ]

OH_Perry_1 @ 0 % [ RPV OPEN ( 06 / 34 ) 20190309 ]

WI_Point_Beach_1 @ 97 % [ coastdown to RFO 20190322 ]

IL_Quad_Cities_1 @ 84 % [ coastdown to RFO 20190318 ]


Region 4

AR_Arkansas_1 @ 95 % down from 100 % [ no EN, unk reason fro power drop. ]
AR_Arkansas_2 @ 18 % down from 100 % [ no EN, unk reason fro power drop. ]

CA_DiabloCanyon_1 @ 0 % [ RPV OPEN ( 33 / 33 ) ]

LA_RiverBend_1 @ 75 % unch from 75 % Saturday
[ coastdown to RFO 20190329, coastdown breakdown ]

LA_Waterford_3 @ 0 % [ RPV OPEN ( 69 / 39 ) ]
[ missed planned restart date ]


----------------------------------------------------------------------------------------------------------------------------------------------------

[ There is/are currently 12 unit(s) with the RPV OPEN - ref the 2019 Spring Refueling Outage Schedule and Status ]

posted by Staup Knewkinus a Dane Gerous production. All human rights reserved.