The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.

There are 3 EN(s) today, 2 associated with power stations.

[  ]

NRC Event Notices for February 07, 2019 |
https://www.nrc.gov/reading-rm/doc-colle...207en.html

[  ]

----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
----------------------------------------------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for NY_IndianPoint_2;3 ]


20190206 | NY_IndianPoint_2;3 | FITNESS-FOR-DUTY - CONTRABAND DISCOVERED IN PROTECTED AREA |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53863

On February 05, 2019 at approximately 1800 EST, candy that contained alcohol was discovered in the plant protected area.

The candy was removed from the protected area by station security management.

The licensee notified the NRC Resident Inspector and the State of New York Public Service Commission.


----------- [ 2019 event history for NY_IndianPoint ]

[ No previous ENs for this year. ]


----------------------------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for IL_QuadCities_1 ]

20190205 | IL_QuadCities_1 | UNIT ONE HPCI SYSTEM INOPERABLE DUE TO BLOWN FUSE |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53861

"On February 5, 2019, at 1804 [CST], during a Unit 1 High Pressure Coolant Injection (HPCI) operability surveillance,
a fuse blew in the logic for the motor speed changer for the turbine.

The Unit 1 HPCI system was taken out of service for planned maintenance earlier in the day.

The fuse issue was not related to any maintenance activities.
[
It's just a coincidence that they were testing when the " fuse blew in the logic "
this sounds like a fuse on a cicuit card or something, not a main panel fuse.
There have been other ENs detailing how tech's have caused problems while installing jumper wires that cause unintended
connections ( short circuits ) which can activate/deactivate systems.
Jumper wires are commonly used to defeat/enable signals during testing.

There have also been PART21 EN's concerning faulty components that can cause fuses to blow.  
]


Had HPCI been demanded, this fuse failure would not have allowed HPCI to reach its required speed.
HPCI remains inoperable pending resolution of the issue.
The Reactor Core Isolation Cooling (RCIC) system was confirmed operable.
There were no other systems inoperable at the time of the event.

HPCI had been last successfully tested on November 6, 2018.
[ So this unit appears to have a regular HPCI test schedule of 30 days. ]

"This event is being reported as a condition that could have prevented fulfillment of a safety function in accordance with 10 CFR 50.72(b)(3)(v)(D).
The HPCI system is a single train system and the loss of HPCI could impact the plant's ability to mitigate the consequences of an accident.

"The NRC Senior Resident Inspector has been notified."

Inoperable HPCI places the unit in a 14 day Technical Specification Limiting Condition of Operability.

----------- [ 2019 event history for IL_QuadCities ]

20190201 | IL_QuadCities_1;2 | PART 21 - NOTIFICATION OF DEVIATION OF SWITCHES WITH TERMINAL BLOCKS |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53856



----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for


----------- [ 2019 event history for

[ No previous ENs for this year. ]

----------------------------------------------------------------------------------------------------------------------------------------------------



----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for
----------- [ 2019 event history for
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
------------[ PART 21 ]
----------------------------------------------------------------------------------------------------------------------------------------------------


----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------


Region 1
 
MD_Calvert_Cliffs_2 @ 95 % [ coastdown to RFO 20190218 ]

NY_Nine_Mile_Point_1 @ 97 % [ coastdown to RFO 20190320 ]

NJ_Oyster_Creek_1 @ 0 % [ RPV CLOSED , defueled , permanent shutdown ]

PA_Susquehanna_2 @ 92 % [ coastdown to RFO 20190323 ]


Region 2

AL_Browns_Ferry_2 @ 96 % [ coastdown to RFO 20190218 ]

NC_Brunswick_2 @ 97 % [ coastdown to RFO 20190302 ]

GA_Hatch_2 @ 0 % [ Begin RFO ( 03 / 20 ) ] [ 20190206 shutdown early ]
[ expect RPV OPEN friday ]

TN_Watts_Bar_2 @ 10 % up from 0 %; 0 %; 0 %; 0 % Sunday; 100 % Saturday
[ No EN, unk reason for shutdown. ]


Region 3

IL_Clinton_1 @ 98 % unch from 98% down from 99 % unch from 99 % Sunday; 98 % Saturday
[ units normal operating range ]

IL_La_Salle_2 @ 86 % [ coastdown to RFO 20190206 ]

MN_Monticello_1 @ 91 %  [ coastdown to RFO 20190415 ]

OH_Perry_1 @ 79 % [ coastdown to RFO 20190309 ]
[ power is too low for Mar RFO ]


Region 4

CA_DiabloCanyon_1 @ 97 % [ coastdown to RFO 20190210 ]

LA_RiverBend_1 @ 75 % unch from 75 % unch from 75 % unch from 75 % Sunday; 75 % Saturday;
[ coastdown to RFO 20190330, too low for RFO date. ]

LA_Waterford_3 @ 0 % [ RPV OPEN ( 33 / 39 )  ]


----------------------------------------------------------------------------------------------------------------------------------------------------