Cafe RadLab

Full Version: NPS_Watch Jun 14, 2018
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
The Daily Dose - Exposing the nuclear power industry while the nuclear power industry exposes you.


There are 2 EN(s) today, 0 associated with power stations.


NRC Event Notices for June 14, 2018    
https://www.nrc.gov/reading-rm/doc-colle...614en.html
[ page nav working, event date/time not entered ]
----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Power Reactor Event Notices
----------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2018 event history for

--------------------------------------------------------------------------------------------------
----------- [ Current event for

----------- [ 2018 event history for

--------------------------------------------------------------------------------------------------
----------- [ Part 21 Notice ]
----------------------------------------------------------------------------------------------------------------------------------------------------
----------------- Other reactor info from daily power tracking
-----------------------------------------------------------------------------------------------------------------

[  ]


Region 1


MA_Pilgrim_1 @ 98 % unchanged 98 % ; 99 % ; 99 % ; 98 %, no EN, reason for power drop unk.




Region 2


AL_Browns_Ferry_3 @ 92 % unchanged
[ Unit unable to achieve full power since exiting RFO Apr 03 ] ( used 45 of typ 43 days )

NC_Brunswick_2 @ 98 % down from 100 % ; 87 % ; 96 % ; 87 % ; 68 % Sunday, no EN, reason for drop unk.



Region 3




Region 4

AR_Arkansas_1 @ 0 % unchanged 0 % PRESSURE BOUNDARY LEAKAGE IDENTIFIED WHILE SHUTDOWN |
https://www.nrc.gov/reading-rm/doc-colle...ml#en53456

WA_Columbia_2 @ 98 % ; 98 % ; 100 % ; 85 %



----------------------------------------------------------------------------------------------------------------------------------------------------

[ There are currently 0 units with the RPV open - ref the Current ReFueling Outage Schedule and Status ]

posted by Staup Knewkinus a Dane Gerous production. All human rights reserved.